ITAC Assessment: MO0181
ITAC logo
ITAC Assessment: MO0181
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Telephone pedestals
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 132
Plant Area 112,000
ft2
Annual Production 15,000,000
lb
Production Hrs. Annual 4,488
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,643 1,614,009
kWh
Electricity Demand $13,935 2,798
kW-mo/yr
LPG $68,465 13,262
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,043 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,861

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Solid Waste (non-haz) Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $944 $1,390 $758
14,068
kWh
$186
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,797 $3,616 $1,436
26,671
kWh
$361
-
kW-mo/yr
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $142 - $126
2,345
kWh
$16
-
kW-mo/yr
- - - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $294 - $241
4,396
kWh
$53
-
kW-mo/yr
- - - -
05 2.4133: Use most efficient type of electric motors $2,324 $5,161 $1,905
35,463
kWh
$419
-
kW-mo/yr
- - - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $3,040 $160 $2,493
46,600
kWh
$547
-
kW-mo/yr
- - - -
07 2.4221: Install compressor air intakes in coolest locations $2,598 $35 $2,131
39,859
kWh
$467
-
kW-mo/yr
- - - -
08 2.1332: Convert combustion equipment to burn natural gas $41,832 $4,430 - - $(-26,633.0)
-
MMBtu
$68,465
-
MMBtu
- -
09 3.5248: Separate and recycle scrap metal to foundry or for sale $1,724 $130 - - - - $1,724
-
lb
-
10 3.5316: Contract a wood pallet recycling company $840 $1,000 - - - - $840
-
lb
-
11 2.8114: Change rate schedules or other changes in utility service $1,508 $4,890 - - - - - $1,508
-
Tgal
TOTAL RECOMMENDED $57,043 $20,812 $9,090
169,402
kWh
$2,049
-
kW-mo/yr
$(-26,633.0)
-
MMBtu
$68,465
-
MMBtu
$2,564
-
lb
$1,508
-
Tgal
TOTAL IMPLEMENTED $53,861 $20,652 $6,471
120,457
kWh
$1,486
-
kW-mo/yr
$(-26,633.0)
-
MMBtu
$68,465
-
MMBtu
$2,564
-
lb
$1,508
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Solid Waste (non-haz) Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs