Assessment Year | 1996 |
---|---|
Principal Product | Aluminum A/C Manifolds |
NAICS |
n/a
|
SIC | 3354: Aluminum Extruded Products |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
75,000
ft2
|
Annual Production | 3,000,000
pieces
|
Production Hrs. Annual | 6,900
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $125,302 | 2,159,437 |
kWh
|
$0.058 |
Electricity Demand | $13,664 | 6,075 |
kW-mo/yr
|
$2.25 |
Natural Gas | $35,240 | 6,620 |
MMBtu
|
$5.32 |
LPG | $6,903 | 863 |
MMBtu
|
$8.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $26,201 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,398 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $535 | $394 |
$500
8,499
kWh
|
$35
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $892 | $1,216 |
$830
14,361
kWh
|
$62
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,595 | $120 |
$1,512
26,084
kWh
|
$83
-
kW-mo/yr
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $7,347 | $1,281 |
$6,962
119,871
kWh
|
$385
-
kW-mo/yr
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $10,106 | $80 |
$9,558
164,713
kWh
|
$548
-
kW-mo/yr
|
- | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $268 | - |
$250
4,396
kWh
|
$18
-
kW-mo/yr
|
- | |
07 | 2.4133: Use most efficient type of electric motors | $1,458 | $3,003 |
$1,361
23,447
kWh
|
$97
-
kW-mo/yr
|
- | |
08 | 3.6192: Use a less expensive method of waste removal | $4,000 | $8,000 | - | - |
$4,000
-
lb
|
|
TOTAL RECOMMENDED | $26,201 | $14,094 |
$20,973
361,371
kWh
|
$1,228
-
kW-mo/yr
|
$4,000
-
lb
|
||
TOTAL IMPLEMENTED | $2,398 | $514 |
$2,262
38,979
kWh
|
$136
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs