ITAC Assessment: MO0178
ITAC logo
ITAC Assessment: MO0178
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Aluminum A/C Manifolds
NAICS
n/a
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 75,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 6,900
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,302 2,159,437
kWh
Electricity Demand $13,664 6,075
kW-mo/yr
Natural Gas $35,240 6,620
MMBtu
LPG $6,903 863
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,201 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,398

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $535 $394 $500
8,499
kWh
$35
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $892 $1,216 $830
14,361
kWh
$62
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,595 $120 $1,512
26,084
kWh
$83
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $7,347 $1,281 $6,962
119,871
kWh
$385
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $10,106 $80 $9,558
164,713
kWh
$548
-
kW-mo/yr
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $268 - $250
4,396
kWh
$18
-
kW-mo/yr
-
07 2.4133: Use most efficient type of electric motors $1,458 $3,003 $1,361
23,447
kWh
$97
-
kW-mo/yr
-
08 3.6192: Use a less expensive method of waste removal $4,000 $8,000 - - $4,000
-
lb
TOTAL RECOMMENDED $26,201 $14,094 $20,973
361,371
kWh
$1,228
-
kW-mo/yr
$4,000
-
lb
TOTAL IMPLEMENTED $2,398 $514 $2,262
38,979
kWh
$136
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings