Assessment Year | 1996 |
---|---|
Principal Product | Annual Reports, Point of Purchase Displays, Static Cling |
NAICS |
n/a
|
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $10 M to 50M |
# of Employees | 77 |
Plant Area |
42,000
ft2
|
Annual Production | 2,000
ton
|
Production Hrs. Annual | 4,992
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $98,546 | 1,569,168 |
kWh
|
$0.063 |
Electricity Demand | $8,763 | 4,670 |
kW-mo/yr
|
$1.88 |
Natural Gas | $8,298 | 1,682 |
MMBtu
|
$4.93 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,479 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,597 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Gaseous Waste Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,818 | $8,136 |
$4,523
72,098
kWh
|
$295
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,614 | $1,991 |
$2,456
38,980
kWh
|
$158
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $240 | - |
$232
3,810
kWh
|
$8
-
kW-mo/yr
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $253 | $80 |
$228
3,517
kWh
|
$25
-
kW-mo/yr
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $98 | $125 |
$88
1,465
kWh
|
$10
-
kW-mo/yr
|
- | |
06 | 2.4133: Use most efficient type of electric motors | $441 | $1,552 |
$416
6,741
kWh
|
$25
-
kW-mo/yr
|
- | |
07 | 3.8132: Use less toxic and volatile solvent substitutes | $5,015 | - | - | - |
$5,015
-
lb
|
|
TOTAL RECOMMENDED | $13,479 | $11,884 |
$7,943
126,611
kWh
|
$521
-
kW-mo/yr
|
$5,015
-
lb
|
||
TOTAL IMPLEMENTED | $5,597 | $9,813 |
$5,259
84,114
kWh
|
$338
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Gaseous Waste Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs