ITAC Assessment: TA0057
ITAC logo
ITAC Assessment: TA0057
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Candy and Nuts for Ice Cream
NAICS 311340: Nonchocolate Confectionery Manufacturing
SIC 2064: Candy and Other Confectionery Products
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 70,000
ft2
Annual Production 28,666,600
lb
Production Hrs. Annual 6,336
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $171,685 3,986,340
kWh
Electricity Demand $62,339 8,217
kW-mo/yr
Electricity Fees $6,367 -
Natural Gas $111,889 16,053
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $845,500 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,570

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Increase in Production Savings
01 4.441: Install automatic packing equipment $823,680 $180,000 - - - $823,680
02 2.3132: Recharge batteries on during off-peak demand periods $12,100 - - $12,100
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,175 $5,783 $3,055
84,097
kWh
$2,120
-
kW-mo/yr
- -
04 2.6218: Turn off equipment when not in use $1,400 - $1,400
38,850
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,300 $72 $680
18,780
kWh
$620
-
kW-mo/yr
- -
06 2.2136: Install / repair insulation on steam lines $550 $175 - - $550
-
MMBtu
-
07 2.2511: Insulate bare equipment $460 $336 - - $460
-
MMBtu
-
08 2.7135: Install occupancy sensors $275 $180 $275
7,527
kWh
- - -
09 2.2122: Install / repair insulation on condensate lines $240 $110 - - $240
-
MMBtu
-
10 2.7142: Utilize higher efficiency lamps and/or ballasts $200 $395 $140
3,925
kWh
$60
-
kW-mo/yr
- -
11 2.6218: Turn off equipment when not in use $120 - - - $120
-
MMBtu
-
TOTAL RECOMMENDED $845,500 $187,051 $5,550
153,179
kWh
$14,900
-
kW-mo/yr
$1,370
-
MMBtu
$823,680
TOTAL IMPLEMENTED $20,570 $6,430 $5,550
153,179
kWh
$14,900
-
kW-mo/yr
$120
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs