Assessment Year | 2003 |
---|---|
Principal Product | Candy and Nuts for Ice Cream |
NAICS | 311340: Nonchocolate Confectionery Manufacturing |
SIC | 2064: Candy and Other Confectionery Products |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
70,000
ft2
|
Annual Production | 28,666,600
lb
|
Production Hrs. Annual | 6,336
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $171,685 | 3,986,340 |
kWh
|
$0.043 |
Electricity Demand | $62,339 | 8,217 |
kW-mo/yr
|
$7.59 |
Electricity Fees | $6,367 | - |
|
- |
Natural Gas | $111,889 | 16,053 |
MMBtu
|
$6.97 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $845,500 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,570 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.441: Install automatic packing equipment | $823,680 | $180,000 | - | - | - | $823,680 | |
02 | 2.3132: Recharge batteries on during off-peak demand periods | $12,100 | - | - |
$12,100
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,175 | $5,783 |
$3,055
84,097
kWh
|
$2,120
-
kW-mo/yr
|
- | - | |
04 | 2.6218: Turn off equipment when not in use | $1,400 | - |
$1,400
38,850
kWh
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,300 | $72 |
$680
18,780
kWh
|
$620
-
kW-mo/yr
|
- | - | |
06 | 2.2136: Install / repair insulation on steam lines | $550 | $175 | - | - |
$550
-
MMBtu
|
- | |
07 | 2.2511: Insulate bare equipment | $460 | $336 | - | - |
$460
-
MMBtu
|
- | |
08 | 2.7135: Install occupancy sensors | $275 | $180 |
$275
7,527
kWh
|
- | - | - | |
09 | 2.2122: Install / repair insulation on condensate lines | $240 | $110 | - | - |
$240
-
MMBtu
|
- | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $200 | $395 |
$140
3,925
kWh
|
$60
-
kW-mo/yr
|
- | - | |
11 | 2.6218: Turn off equipment when not in use | $120 | - | - | - |
$120
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $845,500 | $187,051 |
$5,550
153,179
kWh
|
$14,900
-
kW-mo/yr
|
$1,370
-
MMBtu
|
$823,680 | ||
TOTAL IMPLEMENTED | $20,570 | $6,430 |
$5,550
153,179
kWh
|
$14,900
-
kW-mo/yr
|
$120
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs