ITAC Assessment: IA0130
ITAC logo
ITAC Assessment: IA0130
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Hydraulic cylinders
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 235
Plant Area 180,000
ft2
Annual Production 240,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $175,707 4,388,335
kWh
Natural Gas $65,864 21,668
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,819 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,530

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,157 $22,800 $8,157
197,538
kWh
- -
02 2.6218: Turn off equipment when not in use $607 - $607
17,585
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,470 $342 $3,470
86,753
kWh
- -
04 2.2437: Recover waste heat from equipment $1,472 $2,090 - $1,472
-
MMBtu
-
05 2.4221: Install compressor air intakes in coolest locations $944 $165 $944
23,740
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $769 $25 $769
19,343
kWh
- -
07 2.4133: Use most efficient type of electric motors $1,903 $669 $1,903
47,479
kWh
- -
08 2.1213: Direct warmest air to combustion intake $1,249 $1,030 - $1,249
-
MMBtu
-
09 2.7491: Insulate glazing, walls, ceilings, and roofs $6,542 $34,200 - $6,542
-
MMBtu
-
10 3.1191: Change procedures / equipment / operating conditions $8,419 $5,456 - - $8,419
-
lb
11 3.5315: Lease / purchase baler; sell cardboard to recycler $1,287 - - - $1,287
-
lb
TOTAL RECOMMENDED $34,819 $66,777 $15,850
392,438
kWh
$9,263
-
MMBtu
$9,706
-
lb
TOTAL IMPLEMENTED $16,530 $38,331 $5,980
151,817
kWh
$9,263
-
MMBtu
$1,287
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs