ITAC Assessment: MO0176
ITAC logo
ITAC Assessment: MO0176
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Industrial Electric Heaters
NAICS
n/a
SIC 3527:
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 170,000
ft2
Annual Production 120,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,862 5,088,218
kWh
Electricity Demand $118,119 11,798
kW-mo/yr
Natural Gas $44,147 9,178
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,479 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,337

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,549 $2,756 $1,176
43,376
kWh
$1,373
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $99 - $67
2,345
kWh
$32
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $4,378 $80 $2,709
99,648
kWh
$1,669
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $3,212 $205 $2,008
73,857
kWh
$1,204
-
kW-mo/yr
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $166 - $50
1,758
kWh
$116
-
kW-mo/yr
- -
06 2.4133: Use most efficient type of electric motors $973 $4,100 $308
11,430
kWh
$665
-
kW-mo/yr
- -
07 2.6121: Reduce hot water temperature to the minimum required $156 $75 $61
2,345
kWh
$95
-
kW-mo/yr
- -
08 3.4114: Replace city water with recycled water via cooling tower $26,338 $3,000 - - - $26,338
-
Tgal
09 3.7198: Reduce / eliminate use of disposable product $23,608 $11,520 - - $23,608
-
lb
-
TOTAL RECOMMENDED $61,479 $21,736 $6,379
234,759
kWh
$5,154
-
kW-mo/yr
$23,608
-
lb
$26,338
-
Tgal
TOTAL IMPLEMENTED $33,337 $10,061 $3,609
132,766
kWh
$3,390
-
kW-mo/yr
- $26,338
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Water Consumption Savings