Assessment Year | 1996 |
---|---|
Principal Product | Commercial Offset Printing |
NAICS |
n/a
|
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
34,500
ft2
|
Annual Production | 32,000,000
lb
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $175,647 | 3,835,873 |
kWh
|
$0.046 |
Electricity Demand | $17,254 | 9,819 |
kW-mo/yr
|
$1.76 |
Natural Gas | $42,468 | 10,833 |
MMBtu
|
$3.92 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $46,003 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $38,784 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Gaseous Waste Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $276 | $384 |
$253
4,689
kWh
|
$23
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,066 | $9,192 |
$5,786
108,441
kWh
|
$280
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $130 | - |
$125
2,345
kWh
|
$5
-
kW-mo/yr
|
- | |
04 | 2.4133: Use most efficient type of electric motors | $3,887 | $10,719 |
$3,646
68,288
kWh
|
$241
-
kW-mo/yr
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,282 | - |
$2,098
39,273
kWh
|
$184
-
kW-mo/yr
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $3,755 | $386 |
$3,599
67,409
kWh
|
$156
-
kW-mo/yr
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,332 | $90 |
$3,193
59,789
kWh
|
$139
-
kW-mo/yr
|
- | |
08 | 2.4314: Use synthetic lubricant | $684 | $173 |
$656
12,309
kWh
|
$28
-
kW-mo/yr
|
- | |
09 | 3.8132: Use less toxic and volatile solvent substitutes | $25,591 | - | - | - |
$25,591
-
lb
|
|
TOTAL RECOMMENDED | $46,003 | $20,944 |
$19,356
362,543
kWh
|
$1,056
-
kW-mo/yr
|
$25,591
-
lb
|
||
TOTAL IMPLEMENTED | $38,784 | $10,135 |
$12,517
234,466
kWh
|
$676
-
kW-mo/yr
|
$25,591
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Gaseous Waste Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs