| Assessment Year | 1996 |
|---|---|
| Principal Product | Commercial Offset Printing |
| NAICS |
n/a
|
| SIC | 2752: Commercial Printing, Lithographic |
| Sales Range | $10 M to 50M |
| # of Employees | 275 |
| Plant Area |
60,000
ft2
|
| Annual Production | 700,000
lb
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $124,476 | 2,577,081 |
kWh
|
$0.048 |
| Electricity Demand | $9,586 | 7,101 |
kW-mo/yr
|
$1.35 |
| Natural Gas | $6,572 | 1,468 |
MMBtu
|
$4.48 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $15,864 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $14,619 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Gaseous Waste Savings |
|---|---|---|---|---|---|---|---|
| 01 | 3.8132: Use less toxic and volatile solvent substitutes | $3,746 | - | - | - |
$3,746
-
lb
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,941 | $12,048 |
$7,623
133,060
kWh
|
$318
-
kW-mo/yr
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,374 | $1,439 |
$1,309
22,860
kWh
|
$65
-
kW-mo/yr
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $336 | - |
$326
5,569
kWh
|
$10
-
kW-mo/yr
|
- | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,245 | $90 |
$1,195
20,809
kWh
|
$50
-
kW-mo/yr
|
- | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $1,143 | $271 |
$1,099
19,050
kWh
|
$44
-
kW-mo/yr
|
- | |
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $79 | - |
$67
1,172
kWh
|
$12
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $15,864 | $13,848 |
$11,619
202,520
kWh
|
$499
-
kW-mo/yr
|
$3,746
-
lb
|
||
| TOTAL IMPLEMENTED | $14,619 | $13,758 |
$10,424
181,711
kWh
|
$449
-
kW-mo/yr
|
$3,746
-
lb
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Gaseous Waste Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs