ITAC Assessment: IA0532
ITAC logo
ITAC Assessment: IA0532
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Bread and Rolls
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 135
Plant Area 47,299
ft2
Annual Production 69,193,595
lb
Production Hrs. Annual 6,240
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $173,664 4,651,800
kWh
Electricity Demand $142,656 9,114
kW-mo/yr
Electricity Fees $15,416 -
Natural Gas $309,955 52,883
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,845 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,203

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,363 $44,410 $4,742
127,265
kWh
$4,621
-
kW-mo/yr
- -
02 2.2437: Recover waste heat from equipment $5,883 $2,175 - - - $5,883
-
MMBtu
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,544 $2,460 - - $4,544 -
04 2.4133: Use most efficient type of electric motors $5,935 $9,474 $3,293
88,526
kWh
$2,642
-
kW-mo/yr
- -
05 2.1213: Direct warmest air to combustion intake $1,465 $210 - - - $1,465
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $1,098 $85 $616
16,557
kWh
$482
-
kW-mo/yr
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $893 $35 $483
13,728
kWh
$410
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $664 $1,752 $273
7,315
kWh
$391
-
kW-mo/yr
- -
TOTAL RECOMMENDED $29,845 $60,601 $9,407
253,391
kWh
$8,546
-
kW-mo/yr
$4,544 $7,348
-
MMBtu
TOTAL IMPLEMENTED $24,203 $58,056 $8,791
236,834
kWh
$8,064
-
kW-mo/yr
- $7,348
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs