Assessment Year | 1996 |
---|---|
Principal Product | Magazine and Book Printing |
NAICS |
n/a
|
SIC | 2732: Book Printing |
Sales Range | $10 M to 50M |
# of Employees | 176 |
Plant Area |
62,000
ft2
|
Annual Production | 59,400,000
units
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $201,421 | 2,728,019 |
kWh
|
$0.074 |
Natural Gas | $12,029 | 2,492 |
MMBtu
|
$4.83 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,324 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,324 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Gaseous Waste Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,448 | $2,271 |
$3,448
46,600
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,706 | $11,112 |
$4,706
63,892
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $173 | - |
$173
2,345
kWh
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $751 | - |
$751
10,258
kWh
|
- | |
05 | 2.4133: Use most efficient type of electric motors | $4,663 | $9,284 |
$4,663
63,306
kWh
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,473 | $80 |
$4,473
60,668
kWh
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $1,688 | $112 |
$1,688
22,860
kWh
|
- | |
08 | 2.6121: Reduce hot water temperature to the minimum required | $267 | $120 |
$267
3,517
kWh
|
- | |
09 | 3.8132: Use less toxic and volatile solvent substitutes | $1,155 | - | - |
$1,155
-
lb
|
|
TOTAL RECOMMENDED | $21,324 | $22,979 |
$20,169
273,446
kWh
|
$1,155
-
lb
|
||
TOTAL IMPLEMENTED | $21,324 | $22,979 |
$20,169
273,446
kWh
|
$1,155
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Gaseous Waste Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs