ITAC Assessment: MO0168
ITAC logo
ITAC Assessment: MO0168
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product High Quality Printed Material
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 98
Plant Area 64,000
ft2
Annual Production 6,100,000
lb
Production Hrs. Annual 5,304
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,544 2,470,106
kWh
Electricity Demand $16,132 7,377
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,011 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,529

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $3,417 $6,227 $3,196
53,927
kWh
$221
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $482 $43 $446
7,620
kWh
$36
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,560 $109 $1,446
24,326
kWh
$114
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $9,649 $10,288 $8,972
151,524
kWh
$677
-
kW-mo/yr
-
05 2.2437: Recover waste heat from equipment $1,443 $3,700 $1,443
24,326
kWh
- -
06 3.5121: Recycle waste ink and cleanup solvent $6,460 - - - $6,460
-
gal
TOTAL RECOMMENDED $23,011 $20,367 $15,503
261,723
kWh
$1,048
-
kW-mo/yr
$6,460
-
gal
TOTAL IMPLEMENTED $22,529 $20,324 $15,057
254,103
kWh
$1,012
-
kW-mo/yr
$6,460
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs