ITAC Assessment: KU0104
ITAC logo
ITAC Assessment: KU0104
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product GREASES, OILS, FLUIDS
NAICS
n/a
SIC 2992: Lubricating Oils and Greases
Sales Range $1
M
to 5
M
# of Employees 98
Plant Area
n/a
Annual Production 7,000,000
lb
Production Hrs. Annual 2,134
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,679 401,817
kWh
Natural Gas $81,734 16,525
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,343 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,343

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $3,312 $1,500 - $3,312
-
MMBtu
02 2.1131: Repair faulty insulation in furnaces, boilers, etc $2,960 $800 - $2,960
-
MMBtu
03 2.2113: Repair or replace steam traps $2,673 $2,000 - $2,673
-
MMBtu
04 2.2122: Install / repair insulation on condensate lines $1,624 $400 - $1,624
-
MMBtu
05 2.1131: Repair faulty insulation in furnaces, boilers, etc $916 $800 - $916
-
MMBtu
06 2.2136: Install / repair insulation on steam lines $9,791 $5,000 - $9,791
-
MMBtu
07 2.7221: Lower temperature during the winter season and vice-versa $2,308 $132 $759
8,792
kWh
$1,549
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $759 $1,026 $759
8,792
kWh
-
TOTAL RECOMMENDED $24,343 $11,658 $1,518
17,584
kWh
$22,825
-
MMBtu
TOTAL IMPLEMENTED $24,343 $11,658 $1,518
17,584
kWh
$22,825
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs