Assessment Year | 2001 |
---|---|
Principal Product | Ball Bearings |
NAICS |
n/a
|
SIC | 3562: Ball and Roller Bearings |
Sales Range | $50 M to 100M |
# of Employees | 419 |
Plant Area |
160,000
ft2
|
Annual Production | 7,000,000
lb
|
Production Hrs. Annual | 6,174
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $170,491 | 10,360,199 |
kWh
|
$0.016 |
Electricity Demand | $221,954 | 20,724 |
kW-mo/yr
|
$10.71 |
Natural Gas | $177,844 | 47,186 |
MMBtu
|
$3.77 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $239,484 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $103,520 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 4.424: Improve space comfort conditioning | $101,536 | $402,000 |
$(-23,464.0)
(-634,232)
kWh
|
- | - | - | - | - | $125,000 | |
02 | 3.8132: Use less toxic and volatile solvent substitutes | $95,666 | $2,550 | - | - | - |
$15,333
-
gal
|
- | $80,333 | - | |
03 | 4.621: Use fixtures to reduce machine changeout times | $28,005 | $12,000 | - | - | - | - | $28,005 | - | - | |
04 | 2.6218: Turn off equipment when not in use | $2,646 | $1,500 |
$2,646
147,128
kWh
|
- | - | - | - | - | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,232 | - |
$2,890
160,610
kWh
|
$3,342
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $2,028 | - |
$537
29,894
kWh
|
$1,491
-
kW-mo/yr
|
- | - | - | - | - | |
07 | 2.2437: Recover waste heat from equipment | $1,984 | $6,000 |
$850
47,186
kWh
|
- |
$1,134
-
MMBtu
|
- | - | - | - | |
08 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $1,387 | $500 | - | - |
$1,387
-
MMBtu
|
- | - | - | - | |
TOTAL RECOMMENDED | $239,484 | $424,550 |
$(-16,541.0)
(-249,414)
kWh
|
$4,833
-
kW-mo/yr
|
$2,521
-
MMBtu
|
$15,333
-
gal
|
$28,005 | $80,333 | $125,000 | ||
TOTAL IMPLEMENTED | $103,520 | $408,000 |
$(-22,614.0)
(-587,046)
kWh
|
- |
$1,134
-
MMBtu
|
- | - | - | $125,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs