ITAC Assessment: MO0167
ITAC logo
ITAC Assessment: MO0167
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Urethane, Epoxy, and other coatings
NAICS
n/a
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 135,000
ft2
Annual Production 700
Tgal
Production Hrs. Annual 4,160
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,159 2,062,134
kWh
Electricity Demand $12,992 5,685
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,938 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,394

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,288 $1,980 $1,145
18,171
kWh
$143
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,040 $5,272 $2,703
42,497
kWh
$337
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $265 - $255
4,103
kWh
$10
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $810 $65 $745
11,723
kWh
$65
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,504 $60 $2,244
35,463
kWh
$260
-
kW-mo/yr
-
06 2.4314: Use synthetic lubricant $599 $69 $538
8,499
kWh
$61
-
kW-mo/yr
-
07 2.6121: Reduce hot water temperature to the minimum required $411 $60 $356
5,569
kWh
$55
-
kW-mo/yr
-
08 3.5248: Separate and recycle scrap metal to foundry or for sale $2,021 $9,925 - - $2,021
-
lb
TOTAL RECOMMENDED $10,938 $17,431 $7,986
126,025
kWh
$931
-
kW-mo/yr
$2,021
-
lb
TOTAL IMPLEMENTED $5,394 $12,099 $3,039
48,065
kWh
$334
-
kW-mo/yr
$2,021
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs