Assessment Year | 1995 |
---|---|
Principal Product | Electrical Enclosures |
NAICS |
n/a
|
SIC | 3644: Noncurrent-Carrying Wiring Devices |
Sales Range | $10 M to 50M |
# of Employees | 305 |
Plant Area |
223,000
ft2
|
Annual Production | 13,000,000
lb
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $215,443 | 3,504,103 |
kWh
|
$0.061 |
Natural Gas | $190,753 | 52,934 |
MMBtu
|
$3.60 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,312 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,634 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Liquid (haz) Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $4,744 | $11,909 |
$4,744
80,598
kWh
|
- | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,038 | - |
$2,038
34,584
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,634 | $2,360 |
$2,634
44,256
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,357 | $10,064 |
$3,357
55,979
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $146 | - |
$146
2,638
kWh
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $2,308 | $1,622 |
$2,308
39,273
kWh
|
- | |
07 | 3.4113: Treat and reuse rinse waters | $23,085 | $40,000 | - |
$23,085
-
gal
|
|
TOTAL RECOMMENDED | $38,312 | $65,955 |
$15,227
257,328
kWh
|
$23,085
-
gal
|
||
TOTAL IMPLEMENTED | $2,634 | $2,360 |
$2,634
44,256
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Other Liquid (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs