ITAC Assessment: MO0164
ITAC logo
ITAC Assessment: MO0164
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Electrical Enclosures
NAICS
n/a
SIC 3644: Noncurrent-Carrying Wiring Devices
Sales Range $10
M
to 50
M
# of Employees 305
Plant Area 223,000
ft2
Annual Production 13,000,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $215,443 3,504,103
kWh
Natural Gas $190,753 52,934
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,312 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,634

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (haz) Savings
01 2.4133: Use most efficient type of electric motors $4,744 $11,909 $4,744
80,598
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,038 - $2,038
34,584
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,634 $2,360 $2,634
44,256
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,357 $10,064 $3,357
55,979
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $146 - $146
2,638
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $2,308 $1,622 $2,308
39,273
kWh
-
07 3.4113: Treat and reuse rinse waters $23,085 $40,000 - $23,085
-
gal
TOTAL RECOMMENDED $38,312 $65,955 $15,227
257,328
kWh
$23,085
-
gal
TOTAL IMPLEMENTED $2,634 $2,360 $2,634
44,256
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs