ITAC Assessment: MO0163
ITAC logo
ITAC Assessment: MO0163
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Headwear
NAICS
n/a
SIC 2353: Hats, Caps, and Millinery
Sales Range $5
M
to 10
M
# of Employees 275
Plant Area 55,000
ft2
Annual Production 3,400,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,287 898,300
kWh
LPG $3,646 828
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,394 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,758

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,961 $8,360 $2,961
53,048
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,010 $2,215 $1,010
18,171
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $122 - $122
2,345
kWh
- -
04 2.4133: Use most efficient type of electric motors $660 $5,530 $660
10,844
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $46 - $46
879
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,292 $138 $1,292
22,274
kWh
- -
07 2.4221: Install compressor air intakes in coolest locations $385 $194 $385
6,448
kWh
- -
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $508 $1,768 $730
11,723
kWh
$(-222.0)
-
MMBtu
-
09 2.6121: Reduce hot water temperature to the minimum required $237 $10 $237
3,810
kWh
- -
10 3.5315: Lease / purchase baler; sell cardboard to recycler $3,173 - - - $3,173
-
lb
TOTAL RECOMMENDED $10,394 $18,215 $7,443
129,542
kWh
$(-222.0)
-
MMBtu
$3,173
-
lb
TOTAL IMPLEMENTED $5,758 $2,363 $2,585
45,134
kWh
- $3,173
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs