ITAC Assessment: MO0161
ITAC logo
ITAC Assessment: MO0161
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Rubber/steel composite products
NAICS
n/a
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 74,000
ft2
Annual Production 3,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $548,760 10,179,074
kWh
Natural Gas $160,727 28,500
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,108 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,337

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,126 $2,024 $2,126
40,739
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $997 $682 $997
19,050
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $122 - $122
2,345
kWh
-
04 2.4133: Use most efficient type of electric motors $8,649 $15,514 $8,649
164,713
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $180 - $180
3,517
kWh
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $771 $642 $771
10,258
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $8,440 $306 $8,440
161,489
kWh
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $10,805 $5,000 $10,805
206,624
kWh
-
09 2.1311: Replace electrically-operated equipment with fossil fuel equipment $18,018 $11,160 $30,639
524,619
kWh
$(-12,621.0)
-
MMBtu
TOTAL RECOMMENDED $50,108 $35,328 $62,729
1,133,354
kWh
$(-12,621.0)
-
MMBtu
TOTAL IMPLEMENTED $49,337 $34,686 $61,958
1,123,096
kWh
$(-12,621.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs