Assessment Year | 1995 |
---|---|
Principal Product | Coatings and Paints |
NAICS |
n/a
|
SIC | 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
100,000
ft2
|
Annual Production | 1,000,000
Tgal
|
Production Hrs. Annual | 2,200
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $83,490 | 1,053,048 |
kWh
|
$0.079 |
Natural Gas | $22,827 | 4,608 |
MMBtu
|
$4.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $34,343 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,243 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Water Disposal Savings | Other Liquid (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,896 | $8,456 |
$4,896
65,358
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,749 | $2,589 |
$2,749
36,635
kWh
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $463 | $395 |
$463
5,862
kWh
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $609 | $195 |
$609
7,034
kWh
|
- | - | |
05 | 2.4133: Use most efficient type of electric motors | $406 | $586 |
$406
5,569
kWh
|
- | - | |
06 | 2.6121: Reduce hot water temperature to the minimum required | $120 | $40 |
$120
2,345
kWh
|
- | - | |
07 | 3.4114: Replace city water with recycled water via cooling tower | $1,100 | $2,500 |
$100
1,465
kWh
|
$1,000
-
Tgal
|
- | |
08 | 3.5311: Recover and reuse waste material | $24,000 | $20,000 | - | - |
$24,000
-
gal
|
|
TOTAL RECOMMENDED | $34,343 | $34,761 |
$9,343
124,268
kWh
|
$1,000
-
Tgal
|
$24,000
-
gal
|
||
TOTAL IMPLEMENTED | $9,243 | $12,261 |
$9,243
122,803
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Water Disposal Savings | Other Liquid (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs