ITAC Assessment: MO0150
ITAC logo
ITAC Assessment: MO0150
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Coatings and Paints
NAICS
n/a
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 1,000,000
Tgal
Production Hrs. Annual 2,200
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,490 1,053,048
kWh
Natural Gas $22,827 4,608
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,343 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,243

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Other Liquid (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,896 $8,456 $4,896
65,358
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,749 $2,589 $2,749
36,635
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $463 $395 $463
5,862
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $609 $195 $609
7,034
kWh
- -
05 2.4133: Use most efficient type of electric motors $406 $586 $406
5,569
kWh
- -
06 2.6121: Reduce hot water temperature to the minimum required $120 $40 $120
2,345
kWh
- -
07 3.4114: Replace city water with recycled water via cooling tower $1,100 $2,500 $100
1,465
kWh
$1,000
-
Tgal
-
08 3.5311: Recover and reuse waste material $24,000 $20,000 - - $24,000
-
gal
TOTAL RECOMMENDED $34,343 $34,761 $9,343
124,268
kWh
$1,000
-
Tgal
$24,000
-
gal
TOTAL IMPLEMENTED $9,243 $12,261 $9,243
122,803
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Water Disposal Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs