ITAC Assessment: MO0147
ITAC logo
ITAC Assessment: MO0147
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product corrugated cardboard
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 147
Plant Area 170,000
ft2
Annual Production 60,000
ton
Production Hrs. Annual 8,112
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $362,231 6,329,133
kWh
Natural Gas $249,817 51,968
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,405 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,255

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,591 $14,598 $5,591
99,062
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,430 $502 $2,430
43,083
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $7,857 $1,016 $7,857
140,094
kWh
-
04 2.4314: Use synthetic lubricant $2,715 $672 $2,715
48,359
kWh
-
05 2.4133: Use most efficient type of electric motors $4,763 $6,281 $4,763
84,701
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,150 $235 $2,150
38,101
kWh
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $1,899 $1,195 - $1,899
-
MMBtu
TOTAL RECOMMENDED $27,405 $24,499 $25,506
453,400
kWh
$1,899
-
MMBtu
TOTAL IMPLEMENTED $25,255 $24,264 $23,356
415,299
kWh
$1,899
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs