Assessment Year | 1995 |
---|---|
Principal Product | oil and water based paint |
NAICS |
n/a
|
SIC | 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products |
Sales Range | $50 M to 100M |
# of Employees | 82 |
Plant Area |
157,725
ft2
|
Annual Production | 66,039
Tgal
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $236,198 | 3,852,286 |
kWh
|
$0.061 |
LPG | $3,252 | 360 |
MMBtu
|
$9.03 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,342 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,810 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,744 | $29,900 |
$9,744
182,298
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,009 | $306 |
$1,009
20,516
kWh
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $4,808 | $13,744 |
$4,808
88,218
kWh
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,401 | $725 |
$2,401
20,516
kWh
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,228 | $100 |
$5,228
97,597
kWh
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $1,848 | $353 |
$1,848
34,584
kWh
|
- | |
07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,213 | $4,880 |
$4,925
92,907
kWh
|
$(-2,712.0)
-
MMBtu
|
|
08 | 2.6121: Reduce hot water temperature to the minimum required | $91 | $40 |
$91
1,465
kWh
|
- | |
TOTAL RECOMMENDED | $27,342 | $50,048 |
$30,054
538,101
kWh
|
$(-2,712.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $19,810 | $45,028 |
$19,810
346,132
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs