ITAC Assessment: MO0140
ITAC logo
ITAC Assessment: MO0140
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Pants
NAICS
n/a
SIC 2325: Men's and Boys' Separate Trousers and Slacks
Sales Range $5
M
to 10
M
# of Employees 290
Plant Area 40,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 1,960
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,054 989,449
kWh
LPG $13,422 1,612
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,880 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,921

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings LPG Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,303 $37,944 $5,303
77,374
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,214 $1,488 $2,214
32,239
kWh
- -
03 2.1332: Convert combustion equipment to burn natural gas $3,337 $200 - $(-9,369.0)
-
MMBtu
$12,706
-
MMBtu
04 2.6121: Reduce hot water temperature to the minimum required $408 $150 - - $408
-
MMBtu
05 2.4133: Use most efficient type of electric motors $521 $4,594 $521
7,620
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $269 $925 $269
3,810
kWh
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $248 $25 $248
4,103
kWh
- -
08 2.4221: Install compressor air intakes in coolest locations $284 $171 $284
4,689
kWh
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $296 $686 $296
4,396
kWh
- -
TOTAL RECOMMENDED $12,880 $46,183 $9,135
134,231
kWh
$(-9,369.0)
-
MMBtu
$13,114
-
MMBtu
TOTAL IMPLEMENTED $6,921 $8,064 $3,584
52,754
kWh
$(-9,369.0)
-
MMBtu
$12,706
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs