ITAC Assessment: MO0132
ITAC logo
ITAC Assessment: MO0132
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product conveyor belts
NAICS
n/a
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 198,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,864
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $151,118 2,296,014
kWh
Natural Gas $34,711 7,011
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,452 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,514

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Consumption Savings
01 3.4114: Replace city water with recycled water via cooling tower $5,780 $1,580 $(-420.0)
(-6,448)
kWh
- $6,200
-
Tgal
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,750 $675 $1,750
26,671
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,612 $2,530 $1,612
24,619
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,545 $200 $1,545
23,447
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $285 $439 $285
4,396
kWh
- -
06 2.4133: Use most efficient type of electric motors $4,114 $8,337 $4,114
62,427
kWh
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $647 $200 $647
9,965
kWh
- -
08 2.4221: Install compressor air intakes in coolest locations $1,412 $490 $1,412
21,395
kWh
- -
09 2.1311: Replace electrically-operated equipment with fossil fuel equipment $938 $2,385 $938
4,103
kWh
- -
10 2.4314: Use synthetic lubricant $733 $208 $733
11,137
kWh
- -
11 2.1233: Analyze flue gas for proper air/fuel ratio $636 $1,195 - $636
-
MMBtu
-
TOTAL RECOMMENDED $19,452 $18,239 $12,616
181,712
kWh
$636
-
MMBtu
$6,200
-
Tgal
TOTAL IMPLEMENTED $18,514 $15,854 $11,678
177,609
kWh
$636
-
MMBtu
$6,200
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs