| Assessment Year | 1990 |
|---|---|
| Principal Product | WRENCHES, CHISELS ETC. |
| NAICS |
n/a
|
| SIC | 3423: Hand and Edge Tools, Except Machine Tools and Handsaws |
| Sales Range | $50 M to 100M |
| # of Employees | 350 |
| Plant Area |
n/a
|
| Annual Production | 9,500,000
pieces
|
| Production Hrs. Annual | 7,490
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $700,058 | 15,987,691 |
kWh
|
$0.044 |
| Natural Gas | $316,695 | 82,874 |
MMBtu
|
$3.82 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $47,259 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $17,059 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $1,633 | $3,500 |
$1,633
37,222
kWh
|
- | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,300 | $6,000 |
$6,300
143,904
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,453 | $1,051 |
$2,453
55,979
kWh
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $3,100 | $300 |
$3,100
69,754
kWh
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,386 | $500 |
$2,386
65,944
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,187 | $1,752 |
$1,187
28,429
kWh
|
- | |
| 07 | 2.2511: Insulate bare equipment | $1,200 | $1,100 | - |
$1,200
-
MMBtu
|
|
| 08 | 2.3212: Optimize plant power factor | $29,000 | $32,500 |
$29,000
-
kWh
|
- | |
| TOTAL RECOMMENDED | $47,259 | $46,703 |
$46,059
401,232
kWh
|
$1,200
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $17,059 | $13,103 |
$17,059
401,232
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs