ITAC Assessment: CO0182
ITAC logo
ITAC Assessment: CO0182
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product WRENCHES, CHISELS ETC.
NAICS
n/a
SIC 3423: Hand and Edge Tools, Except Machine Tools and Handsaws
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area
n/a
Annual Production 9,500,000
pieces
Production Hrs. Annual 7,490
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $700,058 15,987,691
kWh
Natural Gas $316,695 82,874
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,259 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,059

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $1,633 $3,500 $1,633
37,222
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,300 $6,000 $6,300
143,904
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,453 $1,051 $2,453
55,979
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $3,100 $300 $3,100
69,754
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,386 $500 $2,386
65,944
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,187 $1,752 $1,187
28,429
kWh
-
07 2.2511: Insulate bare equipment $1,200 $1,100 - $1,200
-
MMBtu
08 2.3212: Optimize plant power factor $29,000 $32,500 $29,000
-
kWh
-
TOTAL RECOMMENDED $47,259 $46,703 $46,059
401,232
kWh
$1,200
-
MMBtu
TOTAL IMPLEMENTED $17,059 $13,103 $17,059
401,232
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs