ITAC Assessment: MO0131
ITAC logo
ITAC Assessment: MO0131
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product circuit protection devices and stamped pieces
NAICS
n/a
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $50
M
to 100
M
# of Employees 596
Plant Area 233,000
ft2
Annual Production 76,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $792,610 14,383,939
kWh
Natural Gas $21,444 4,211
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,351 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,465

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,648 $2,614 $2,116
38,394
kWh
$(-468.0)
-
MMBtu
02 2.4133: Use most efficient type of electric motors $11,050 $18,455 $11,050
200,469
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,415 $985 $4,415
80,012
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $14,092 $34,176 $14,092
255,862
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $384 $824 $384
7,034
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $7,762 $1,470 $7,762
140,973
kWh
-
TOTAL RECOMMENDED $39,351 $58,524 $39,819
722,744
kWh
$(-468.0)
-
MMBtu
TOTAL IMPLEMENTED $15,465 $19,440 $15,465
280,481
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs