Assessment Year | 1994 |
---|---|
Principal Product | Gear Reducing Assemblies |
NAICS |
n/a
|
SIC | 3566: Speed Changers, Industrial High-Speed Drives, and Gears |
Sales Range | $10 M to 50M |
# of Employees | 349 |
Plant Area |
160,000
ft2
|
Annual Production | 675,000
pieces
|
Production Hrs. Annual | 3,920
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $267,960 | 4,133,060 |
kWh
|
$0.065 |
Natural Gas | $31,463 | 6,156 |
MMBtu
|
$5.11 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $31,969 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,417 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,345 | $35,461 |
$7,345
113,423
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,799 | $2,257 |
$4,799
74,150
kWh
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,707 | $150 |
$6,707
103,458
kWh
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $3,895 | $548 |
$3,895
60,082
kWh
|
- | |
05 | 2.2437: Recover waste heat from equipment | $1,374 | $183 |
$1,374
21,102
kWh
|
- | |
06 | 2.4133: Use most efficient type of electric motors | $4,372 | $11,867 |
$4,372
67,409
kWh
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,006 | $490 |
$1,006
15,533
kWh
|
- | |
08 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,271 | $835 |
$89
1,465
kWh
|
$1,182
-
MMBtu
|
|
09 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,200 | $2,611 |
$1,653
25,498
kWh
|
$(-453.0)
-
MMBtu
|
|
TOTAL RECOMMENDED | $31,969 | $54,402 |
$31,240
482,120
kWh
|
$729
-
MMBtu
|
||
TOTAL IMPLEMENTED | $21,417 | $50,623 |
$21,417
330,597
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs