IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Gear Reducing Assemblies
NAICS
n/a
SIC 3566: Speed Changers, Industrial High-Speed Drives, and Gears
Sales Range $10
M
to 50
M
# of Employees 349
Plant Area 160,000
ft2
Annual Production 675,000
pieces
Production Hrs. Annual 3,920
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $267,960 4,133,060
kWh
Natural Gas $31,463 6,156
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,969 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,417

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,345 $35,461 $7,345
113,423
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,799 $2,257 $4,799
74,150
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $6,707 $150 $6,707
103,458
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $3,895 $548 $3,895
60,082
kWh
-
05 2.2437: Recover waste heat from equipment $1,374 $183 $1,374
21,102
kWh
-
06 2.4133: Use most efficient type of electric motors $4,372 $11,867 $4,372
67,409
kWh
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,006 $490 $1,006
15,533
kWh
-
08 2.6212: Turn off equipment during breaks, reduce operating time $1,271 $835 $89
1,465
kWh
$1,182
-
MMBtu
09 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,200 $2,611 $1,653
25,498
kWh
$(-453.0)
-
MMBtu
TOTAL RECOMMENDED $31,969 $54,402 $31,240
482,120
kWh
$729
-
MMBtu
TOTAL IMPLEMENTED $21,417 $50,623 $21,417
330,597
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs