Assessment Year | 1994 |
---|---|
Principal Product | Granite Granules |
NAICS |
n/a
|
SIC | 3295: Minerals and Earths, Ground or Otherwise Treated |
Sales Range | $5 M to 10M |
# of Employees | 144 |
Plant Area |
80,000
ft2
|
Annual Production | 450,000
ton
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $662,943 | 12,490,035 |
kWh
|
$0.053 |
Natural Gas | $822,695 | 311,097 |
MMBtu
|
$2.64 |
LPG | $2,850 | 490 |
MMBtu
|
$5.82 |
Fuel Oil #1 | $9,683 | 1,581 |
MMBtu
|
$6.12 |
Fuel Oil #2 | $53,313 | 9,898 |
MMBtu
|
$5.39 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,278 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,468 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $19,322 | $44,473 |
$19,322
364,009
kWh
|
- | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,128 | $670 |
$4,128
77,667
kWh
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $2,101 | $609 |
$2,101
39,566
kWh
|
- | |
04 | 2.4314: Use synthetic lubricant | $1,817 | $368 |
$1,817
34,291
kWh
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,698 | $120 |
$1,698
31,946
kWh
|
- | |
06 | 2.2437: Recover waste heat from equipment | $883 | $137 | - |
$883
-
MMBtu
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,637 | $6,595 |
$1,637
30,774
kWh
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $692 | $242 |
$692
13,189
kWh
|
- | |
TOTAL RECOMMENDED | $32,278 | $53,214 |
$31,395
591,442
kWh
|
$883
-
MMBtu
|
||
TOTAL IMPLEMENTED | $23,468 | $51,678 |
$23,468
442,263
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs