ITAC Assessment: MO0122
ITAC logo
ITAC Assessment: MO0122
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Granite Granules
NAICS
n/a
SIC 3295: Minerals and Earths, Ground or Otherwise Treated
Sales Range $5
M
to 10
M
# of Employees 144
Plant Area 80,000
ft2
Annual Production 450,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $662,943 12,490,035
kWh
Natural Gas $822,695 311,097
MMBtu
LPG $2,850 490
MMBtu
Fuel Oil #1 $9,683 1,581
MMBtu
Fuel Oil #2 $53,313 9,898
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,278 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,468

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $19,322 $44,473 $19,322
364,009
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,128 $670 $4,128
77,667
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $2,101 $609 $2,101
39,566
kWh
-
04 2.4314: Use synthetic lubricant $1,817 $368 $1,817
34,291
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,698 $120 $1,698
31,946
kWh
-
06 2.2437: Recover waste heat from equipment $883 $137 - $883
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,637 $6,595 $1,637
30,774
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $692 $242 $692
13,189
kWh
-
TOTAL RECOMMENDED $32,278 $53,214 $31,395
591,442
kWh
$883
-
MMBtu
TOTAL IMPLEMENTED $23,468 $51,678 $23,468
442,263
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs