ITAC Assessment: MO0121
ITAC logo
ITAC Assessment: MO0121
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Dairy Products
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 50,000
ft2
Annual Production 49,000,000
lb
Production Hrs. Annual 5,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $260,350 4,111,665
kWh
Natural Gas $86,867 22,657
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,185 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,776

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $7,377 $13,819 $7,377
116,354
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,359 $550 $4,359
68,875
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,411 $335 $1,411
22,274
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,040 $6,204 $2,040
32,239
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $430 $980 $430
6,741
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $436 $25 $436
7,034
kWh
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $2,132 $1,195 - $2,132
-
MMBtu
TOTAL RECOMMENDED $18,185 $23,108 $16,053
253,517
kWh
$2,132
-
MMBtu
TOTAL IMPLEMENTED $13,776 $20,573 $13,776
217,468
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs