ITAC Assessment: MO0115
ITAC logo
ITAC Assessment: MO0115
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Grass Seed, Bird Feed
NAICS
n/a
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 283,600
ft2
Annual Production 175,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $288,285 6,175,557
kWh
LPG $38,490 6,422
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,204 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,443

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $9,743 $365 - - $9,743
02 2.4133: Use most efficient type of electric motors $6,835 $11,383 $6,835
146,542
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,487 $1,380 $2,487
53,341
kWh
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,705 $3,453 $7,803
167,057
kWh
$(-4,098.0)
-
MMBtu
-
05 2.6121: Reduce hot water temperature to the minimum required $8 $20 - $8
-
MMBtu
-
06 2.4221: Install compressor air intakes in coolest locations $1,443 $911 $1,443
31,067
kWh
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,433 $50 $1,433
30,774
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,743 $9,239 $1,743
37,222
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $807 $373 $807
17,292
kWh
- -
TOTAL RECOMMENDED $28,204 $27,174 $22,551
483,295
kWh
$(-4,090.0)
-
MMBtu
$9,743
TOTAL IMPLEMENTED $1,443 $911 $1,443
31,067
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs