Assessment Year | 1994 |
---|---|
Principal Product | Plastic bags and boxes |
NAICS |
n/a
|
SIC | 2673: Plastics, Foil, and Coated Paper Bags |
Sales Range | $10 M to 50M |
# of Employees | 270 |
Plant Area |
128,500
ft2
|
Annual Production | 2,500,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $543,813 | 11,888,042 |
kWh
|
$0.046 |
Natural Gas | $51,280 | 9,457 |
MMBtu
|
$5.42 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $26,104 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,170 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.8113: Purchase gas directly from a contract gas supplier | $11,008 | $5,100 | - | - | $11,008 | |
02 | 2.6121: Reduce hot water temperature to the minimum required | $405 | $30 | - |
$405
-
MMBtu
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $4,698 | $10,623 |
$4,698
102,579
kWh
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $723 | $60 |
$723
15,826
kWh
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,931 | $150 |
$2,931
64,185
kWh
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $2,170 | $836 |
$2,170
47,479
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,509 | $11,269 |
$2,509
54,807
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,660 | $579 |
$1,660
36,342
kWh
|
- | - | |
TOTAL RECOMMENDED | $26,104 | $28,647 |
$14,691
321,218
kWh
|
$405
-
MMBtu
|
$11,008 | ||
TOTAL IMPLEMENTED | $2,170 | $836 |
$2,170
47,479
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs