ITAC Assessment: MO0110
ITAC logo
ITAC Assessment: MO0110
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Battery Chargers
NAICS
n/a
SIC 3629: Electrical Industrial Apparatus, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 190
Plant Area 230,900
ft2
Annual Production 320,420
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,558 1,143,318
kWh
Natural Gas $76,000 15,662
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,967 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,118

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7231: Use radiant heater for spot heating $13,598 $32,200 - $13,598
-
MMBtu
02 2.6121: Reduce hot water temperature to the minimum required $140 $80 $81
1,172
kWh
$59
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,941 $22,684 $4,941
63,892
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,377 $1,232 $3,377
43,669
kWh
-
05 2.4133: Use most efficient type of electric motors $2,882 $4,863 $2,882
37,222
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,789 $350 $1,789
23,154
kWh
-
07 2.2511: Insulate bare equipment $1,519 $2,083 $1,519
19,637
kWh
-
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,310 $1,806 $1,682
17,878
kWh
$(-372.0)
-
MMBtu
09 2.4231: Reduce the pressure of compressed air to the minimum required $1,424 $40 $1,424
18,464
kWh
-
10 2.4221: Install compressor air intakes in coolest locations $987 $1,093 $987
12,896
kWh
-
TOTAL RECOMMENDED $31,967 $66,431 $18,682
237,984
kWh
$13,285
-
MMBtu
TOTAL IMPLEMENTED $12,118 $9,741 $12,059
156,214
kWh
$59
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs