ITAC Assessment: MO0109
ITAC logo
ITAC Assessment: MO0109
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Loose Leaf Binders
NAICS
n/a
SIC 2782: Blankbooks, Looseleaf Binders and Devices
Sales Range $10
M
to 50
M
# of Employees 190
Plant Area 125,000
ft2
Annual Production 6,829,377
pieces
Production Hrs. Annual 2,040
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $129,526 2,910,903
kWh
Natural Gas $11,188 2,562
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,910 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,460

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,195 $12,997 $4,195
94,373
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,364 $895 $2,364
53,048
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $228 $394 $228
4,396
kWh
04 2.4133: Use most efficient type of electric motors $2,069 $8,451 $2,069
46,600
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $391 $670 $391
8,792
kWh
06 2.4221: Install compressor air intakes in coolest locations $946 $1,533 $946
21,395
kWh
07 2.4231: Reduce the pressure of compressed air to the minimum required $469 $60 $469
10,551
kWh
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,248 $1,461 $1,248
10,258
kWh
TOTAL RECOMMENDED $11,910 $26,461 $11,910
249,413
kWh
TOTAL IMPLEMENTED $2,460 $9,121 $2,460
55,392
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs