ITAC Assessment: MO0100
ITAC logo
ITAC Assessment: MO0100
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Fabricated Plate Work
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 87,316
ft2
Annual Production 343,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,261 1,529,601
kWh
Natural Gas $22,085 4,763
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,885 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,481

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $5,010 $9,429 $5,010
70,926
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $740 $130 $740
10,551
kWh
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,336 $1,158 $4,631
65,358
kWh
$(-1,295.0)
-
MMBtu
04 2.2426: Use waste heat from flue gases to heat space conditioning air $2,116 $2,300 - $2,116
-
MMBtu
05 2.6121: Reduce hot water temperature to the minimum required $486 $50 - $486
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,826 $8,080 $2,826
39,859
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,300 $359 $1,300
18,171
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $288 $496 $288
4,103
kWh
-
09 2.4231: Reduce the pressure of compressed air to the minimum required $1,723 $50 $1,723
24,326
kWh
-
10 2.4221: Install compressor air intakes in coolest locations $1,060 $790 $1,060
14,947
kWh
-
TOTAL RECOMMENDED $18,885 $22,842 $17,578
248,241
kWh
$1,307
-
MMBtu
TOTAL IMPLEMENTED $16,481 $20,046 $17,290
244,138
kWh
$(-809.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs