Assessment Year | 1993 |
---|---|
Principal Product | Fabricated Plate Work |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $5 M to 10M |
# of Employees | 75 |
Plant Area |
87,316
ft2
|
Annual Production | 343,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $108,261 | 1,529,601 |
kWh
|
$0.071 |
Natural Gas | $22,085 | 4,763 |
MMBtu
|
$4.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,885 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,481 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $5,010 | $9,429 |
$5,010
70,926
kWh
|
- | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $740 | $130 |
$740
10,551
kWh
|
- | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,336 | $1,158 |
$4,631
65,358
kWh
|
$(-1,295.0)
-
MMBtu
|
|
04 | 2.2426: Use waste heat from flue gases to heat space conditioning air | $2,116 | $2,300 | - |
$2,116
-
MMBtu
|
|
05 | 2.6121: Reduce hot water temperature to the minimum required | $486 | $50 | - |
$486
-
MMBtu
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,826 | $8,080 |
$2,826
39,859
kWh
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,300 | $359 |
$1,300
18,171
kWh
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $288 | $496 |
$288
4,103
kWh
|
- | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,723 | $50 |
$1,723
24,326
kWh
|
- | |
10 | 2.4221: Install compressor air intakes in coolest locations | $1,060 | $790 |
$1,060
14,947
kWh
|
- | |
TOTAL RECOMMENDED | $18,885 | $22,842 |
$17,578
248,241
kWh
|
$1,307
-
MMBtu
|
||
TOTAL IMPLEMENTED | $16,481 | $20,046 |
$17,290
244,138
kWh
|
$(-809.0)
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs