| Assessment Year | 1993 |
|---|---|
| Principal Product | Pharmaceuticals |
| NAICS |
n/a
|
| SIC | 2834: Pharmaceutical Preparations |
| Sales Range | $10 M to 50M |
| # of Employees | 135 |
| Plant Area |
90,000
ft2
|
| Annual Production | 970,779
lb
|
| Production Hrs. Annual | 4,200
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $431,140 | 10,041,911 |
kWh
|
$0.043 |
| Natural Gas | $160,389 | 47,319 |
MMBtu
|
$3.39 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $45,793 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $39,492 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,128 | $734 |
$3,128
72,978
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,250 | $18,608 |
$7,250
169,109
kWh
|
- | |
| 03 | 2.7135: Install occupancy sensors | $4,833 | $1,440 |
$4,833
112,544
kWh
|
- | |
| 04 | 2.4133: Use most efficient type of electric motors | $17,959 | $28,210 |
$17,959
418,523
kWh
|
- | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,375 | $225 |
$4,375
101,993
kWh
|
- | |
| 06 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $1,468 | $2,008 |
$1,468
34,291
kWh
|
- | |
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,153 | $1,595 | - |
$1,153
-
MMBtu
|
|
| 08 | 2.4221: Install compressor air intakes in coolest locations | $5,627 | $1,200 |
$5,627
131,008
kWh
|
- | |
| TOTAL RECOMMENDED | $45,793 | $54,020 |
$44,640
1,040,446
kWh
|
$1,153
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $39,492 | $50,572 |
$38,339
893,611
kWh
|
$1,153
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs