ITAC Assessment: MO0090
ITAC logo
ITAC Assessment: MO0090
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Electric Motors
NAICS
n/a
SIC 3621: Motors and Generators
Sales Range $50
M
to 100
M
# of Employees 502
Plant Area 96,000
ft2
Annual Production 1,300,000
pieces
Production Hrs. Annual 5,880
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $333,687 8,022,274
kWh
LPG $7,551 1,396
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,225 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,953

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.2437: Recover waste heat from equipment $5,587 $2,155 $5,587
134,232
kWh
02 2.4221: Install compressor air intakes in coolest locations $2,582 $2,804 $2,582
62,134
kWh
03 2.4314: Use synthetic lubricant $1,614 $1,245 $1,614
38,687
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,655 $14,813 $5,655
135,991
kWh
05 2.4133: Use most efficient type of electric motors $2,515 $7,131 $2,515
60,375
kWh
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $366 $245 $366
8,792
kWh
07 2.2414: Use waste heat from hot flue gases to preheat $10,030 $23,000 $10,030
241,208
kWh
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $13,876 $3,216 $13,876
(-187,280)
kWh
TOTAL RECOMMENDED $42,225 $54,609 $42,225
494,139
kWh
TOTAL IMPLEMENTED $17,953 $28,148 $17,953
431,419
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs