ITAC Assessment: MO0089
ITAC logo
ITAC Assessment: MO0089
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Porcelain Enameled Products
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 151
Plant Area 124,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 4,125
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $217,876 3,101,114
kWh
Natural Gas $216,466 92,805
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,472 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,801

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,558 $1,295 - $1,558
-
MMBtu
02 2.2511: Insulate bare equipment $1,435 $624 - $1,435
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,222 $480 $3,222
45,721
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,680 $6,612 $3,680
52,462
kWh
-
05 2.4133: Use most efficient type of electric motors $3,906 $8,802 $3,906
55,686
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,571 $200 $1,571
22,274
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $1,100 $1,282 $1,100
15,533
kWh
-
TOTAL RECOMMENDED $16,472 $19,295 $13,479
191,676
kWh
$2,993
-
MMBtu
TOTAL IMPLEMENTED $13,801 $17,813 $10,808
153,869
kWh
$2,993
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs