ITAC Assessment: MO0082
ITAC logo
ITAC Assessment: MO0082
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Printed/Laminated Foils, Films, and
NAICS
n/a
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $50
M
to 100
M
# of Employees 335
Plant Area 247,000
ft2
Annual Production 35,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,222,553 23,475,674
kWh
Natural Gas $412,311 141,229
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $96,946 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $74,380

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $19,825 $31,211 $19,825
381,008
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $19,474 $1,430 $19,474
373,974
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,548 $554 $4,548
87,339
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $19,256 $45,107 $19,256
369,871
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $9,980 $2,627 $9,980
191,676
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $6,722 $790 $6,722
129,250
kWh
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $5,845 $60 $5,845
112,251
kWh
-
08 2.1233: Analyze flue gas for proper air/fuel ratio $11,296 $1,695 - $11,296
-
MMBtu
TOTAL RECOMMENDED $96,946 $83,474 $85,650
1,645,369
kWh
$11,296
-
MMBtu
TOTAL IMPLEMENTED $74,380 $80,435 $74,380
1,428,780
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs