Assessment Year | 1993 |
---|---|
Principal Product | Printed/Laminated Foils, Films, and |
NAICS |
n/a
|
SIC | 2671: Packaging Paper and Plastics Film, Coated and Laminated |
Sales Range | $50 M to 100M |
# of Employees | 335 |
Plant Area |
247,000
ft2
|
Annual Production | 35,000,000
pieces
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,222,553 | 23,475,674 |
kWh
|
$0.052 |
Natural Gas | $412,311 | 141,229 |
MMBtu
|
$2.92 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $96,946 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $74,380 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $19,825 | $31,211 |
$19,825
381,008
kWh
|
- | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $19,474 | $1,430 |
$19,474
373,974
kWh
|
- | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,548 | $554 |
$4,548
87,339
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,256 | $45,107 |
$19,256
369,871
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,980 | $2,627 |
$9,980
191,676
kWh
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $6,722 | $790 |
$6,722
129,250
kWh
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,845 | $60 |
$5,845
112,251
kWh
|
- | |
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $11,296 | $1,695 | - |
$11,296
-
MMBtu
|
|
TOTAL RECOMMENDED | $96,946 | $83,474 |
$85,650
1,645,369
kWh
|
$11,296
-
MMBtu
|
||
TOTAL IMPLEMENTED | $74,380 | $80,435 |
$74,380
1,428,780
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs