ITAC Assessment: UD1024
ITAC logo
ITAC Assessment: UD1024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Vivitrol, Aristada, Risperdal Consta, and Polymer
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range greater than $500
M
# of Employees 564
Plant Area 371,018
ft2
Annual Production 220
units
Production Hrs. Annual 8,064
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,198,130 29,109,077
kWh
Electricity Demand $441,471 47,470
kW-mo/yr
Electricity Fees $54,409 -
Natural Gas $246,349 56,388
MMBtu
Waste Disposal Costs
Water Usage $385,807 42,831
Tgal
Water Disposal $434,665 42,831
Tgal
TOTAL YEARLY COSTS $2,760,831
RECOMMENDED SAVINGS* $1,139,082 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,395

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Primary Raw Material Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $454 - $280
6,806
kWh
$174
-
kW-mo/yr
- - - -
02 3.4111: Use closed cycle process to minimize waste water production $44,273 $40,000 - - - $20,867
-
Tgal
$23,406
-
Tgal
-
03 3.4116: Meter recycled water (to reduce sewer charges) $37,324 $1,300 - - - - $37,324
-
Tgal
-
04 3.4114: Replace city water with recycled water via cooling tower $15,421 - - - - $7,252
-
Tgal
$8,169
-
Tgal
-
05 2.7313: Recycle air for heating, ventilation and air conditioning $921,416 $672,400 $703,568
17,093,497
kWh
$217,848
-
kW-mo/yr
- - - -
06 2.2414: Use waste heat from hot flue gases to preheat $52,582 $24,500 - - $52,582
-
MMBtu
- - -
07 2.1233: Analyze flue gas for proper air/fuel ratio $15,282 $28,000 - - $15,282
-
MMBtu
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $4,759 $10,650 $3,065
74,460
kWh
$1,897
-
kW-mo/yr
- - - $(-203.0)
09 2.4231: Reduce the pressure of compressed air to the minimum required $40,609 $80,500 $18,812
457,035
kWh
$21,797
-
kW-mo/yr
- - - -
10 2.4231: Reduce the pressure of compressed air to the minimum required $6,326 $30,000 $4,831
117,366
kWh
$1,495
-
kW-mo/yr
- - - -
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $636 - $486
11,799
kWh
$150
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $1,139,082 $887,350 $731,042
17,760,963
kWh
$243,361
-
kW-mo/yr
$67,864
-
MMBtu
$28,119
-
Tgal
$68,899
-
Tgal
$(-203.0)
TOTAL IMPLEMENTED $5,395 $10,650 $3,551
86,259
kWh
$2,047
-
kW-mo/yr
- - - $(-203.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs