| Assessment Year | 2021 |
|---|---|
| Principal Product | Vivitrol, Aristada, Risperdal Consta, and Polymer |
| NAICS | 325412: Pharmaceutical Preparation Manufacturing |
| SIC | 2834: Pharmaceutical Preparations |
| Sales Range | greater than $500 M |
| # of Employees | 564 |
| Plant Area |
371,018
ft2
|
| Annual Production | 220
units
|
| Production Hrs. Annual | 8,064
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $1,198,130 | 29,109,077 |
kWh
|
$0.041 | |
| Electricity Demand | $441,471 | 47,470 |
kW-mo/yr
|
$9.30 | |
| Electricity Fees | $54,409 | - |
|
- | |
| Natural Gas | $246,349 | 56,388 |
MMBtu
|
$4.37 | |
| Waste Disposal Costs | |||||
| Water Usage | $385,807 | 42,831 |
Tgal
|
$9.01 | |
| Water Disposal | $434,665 | 42,831 |
Tgal
|
$10.15 | |
| TOTAL YEARLY COSTS | $2,760,831 | ||||
| RECOMMENDED SAVINGS* | $1,139,082 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $5,395 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $454 | - |
$280
6,806
kWh
|
$174
-
kW-mo/yr
|
- | - | - | - | |
| 02 | 3.4111: Use closed cycle process to minimize waste water production | $44,273 | $40,000 | - | - | - |
$20,867
-
Tgal
|
$23,406
-
Tgal
|
- | |
| 03 | 3.4116: Meter recycled water (to reduce sewer charges) | $37,324 | $1,300 | - | - | - | - |
$37,324
-
Tgal
|
- | |
| 04 | 3.4114: Replace city water with recycled water via cooling tower | $15,421 | - | - | - | - |
$7,252
-
Tgal
|
$8,169
-
Tgal
|
- | |
| 05 | 2.7313: Recycle air for heating, ventilation and air conditioning | $921,416 | $672,400 |
$703,568
17,093,497
kWh
|
$217,848
-
kW-mo/yr
|
- | - | - | - | |
| 06 | 2.2414: Use waste heat from hot flue gases to preheat | $52,582 | $24,500 | - | - |
$52,582
-
MMBtu
|
- | - | - | |
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $15,282 | $28,000 | - | - |
$15,282
-
MMBtu
|
- | - | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,759 | $10,650 |
$3,065
74,460
kWh
|
$1,897
-
kW-mo/yr
|
- | - | - | $(-203.0) | |
| 09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $40,609 | $80,500 |
$18,812
457,035
kWh
|
$21,797
-
kW-mo/yr
|
- | - | - | - | |
| 10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,326 | $30,000 |
$4,831
117,366
kWh
|
$1,495
-
kW-mo/yr
|
- | - | - | - | |
| 11 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $636 | - |
$486
11,799
kWh
|
$150
-
kW-mo/yr
|
- | - | - | - | |
| TOTAL RECOMMENDED | $1,139,082 | $887,350 |
$731,042
17,760,963
kWh
|
$243,361
-
kW-mo/yr
|
$67,864
-
MMBtu
|
$28,119
-
Tgal
|
$68,899
-
Tgal
|
$(-203.0) | ||
| TOTAL IMPLEMENTED | $5,395 | $10,650 |
$3,551
86,259
kWh
|
$2,047
-
kW-mo/yr
|
- | - | - | $(-203.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Primary Raw Material Savings | |||