ITAC Assessment: MO0080
ITAC logo
ITAC Assessment: MO0080
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Car Seats
NAICS
n/a
SIC 2531: Public Building and Related Furniture
Sales Range $10
M
to 50
M
# of Employees 176
Plant Area 78,000
ft2
Annual Production 71,100
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,051 1,058,324
kWh
Natural Gas $6,505 1,524
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,990 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,245

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,751 $5,105 $1,751
25,498
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,697 $4,590 $1,697
2,931
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $922 $289 $922
13,482
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,459 $50 $1,459
21,102
kWh
05 2.4221: Install compressor air intakes in coolest locations $1,101 $640 $1,101
15,826
kWh
06 2.4314: Use synthetic lubricant $876 $176 $876
12,603
kWh
07 2.4133: Use most efficient type of electric motors $745 $5,662 $745
10,844
kWh
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $439 $1,025 $439
6,448
kWh
TOTAL RECOMMENDED $8,990 $17,537 $8,990
108,734
kWh
TOTAL IMPLEMENTED $8,245 $11,875 $8,245
97,890
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs