Assessment Year | 1993 |
---|---|
Principal Product | Licorice Candies and Starch-Jellies |
NAICS |
n/a
|
SIC | 2064: Candy and Other Confectionery Products |
Sales Range | $50 M to 100M |
# of Employees | 285 |
Plant Area |
175,000
ft2
|
Annual Production | 30,000,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $739,498 | 11,670,575 |
kWh
|
$0.063 |
Natural Gas | $235,119 | 72,845 |
MMBtu
|
$3.23 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $152,014 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $119,891 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $8,594 | $17,057 |
$8,594
135,698
kWh
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $247 | $570 |
$247
3,810
kWh
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $4,239 | $963 |
$4,239
66,823
kWh
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $3,688 | $100 |
$3,688
58,324
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,881 | $30,661 |
$16,881
266,413
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,518 | $1,258 |
$7,518
118,699
kWh
|
- | - | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $10,227 | $995 | - |
$10,227
-
MMBtu
|
- | |
08 | 2.8113: Purchase gas directly from a contract gas supplier | $86,898 | $300 | - | - | $86,898 | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,722 | $996 |
$13,722
217,468
kWh
|
- | - | |
TOTAL RECOMMENDED | $152,014 | $52,900 |
$54,889
867,235
kWh
|
$10,227
-
MMBtu
|
$86,898 | ||
TOTAL IMPLEMENTED | $119,891 | $49,276 |
$32,993
520,810
kWh
|
- | $86,898 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs