ITAC Assessment: MO0077
ITAC logo
ITAC Assessment: MO0077
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Aircraft Parts
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $5
M
to 10
M
# of Employees 157
Plant Area 68,700
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $152,200 2,357,855
kWh
Natural Gas $21,131 5,249
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,800 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,523

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,862 $10,818 $7,862
121,923
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,944 $872 $4,944
76,495
kWh
-
03 2.4133: Use most efficient type of electric motors $1,913 $4,077 $1,913
29,601
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $949 $245 $949
14,654
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $607 $352 $607
9,379
kWh
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $277 $285 - $277
-
MMBtu
07 2.7447: Install vinyl strip / high speed / air curtain doors $248 $222 $248
3,810
kWh
-
TOTAL RECOMMENDED $16,800 $16,871 $16,523
255,862
kWh
$277
-
MMBtu
TOTAL IMPLEMENTED $16,523 $16,586 $16,523
255,862
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs