ITAC Assessment: AM0582
ITAC logo
ITAC Assessment: AM0582
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Steel castings
NAICS 331513: Steel Foundries (except Investment)
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 392
Plant Area 327,000
ft2
Annual Production 11,013
units
Production Hrs. Annual 8,496
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,471,257 29,916,752
kWh
Electricity Demand $585,186 133,370
kW-mo/yr
Electricity Fees $3,158 -
Natural Gas $1,279,670 91,937
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $977,080 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $733,540

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.1113: Reduce combustion air flow to optimum $404,300 $3,000 - - $404,300
-
MMBtu
- - -
02 2.6218: Turn off equipment when not in use $147,000 $5,600 - - $147,000
-
MMBtu
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $116,300 $220,000 $105,200
1,384,000
kWh
$11,100
-
kW-mo/yr
- - - -
04 2.8124: Hire energy manager $97,900 - $113,700
1,496,000
kWh
- $64,200
-
MMBtu
- - $(-80,000.0)
05 4.111: Add equipment/ operators to reduce production bottleneck $64,500 $50,000 - - - - - $64,500
06 2.8117: Install sub-metering equipment $48,000 $5,000 $48,000
632,000
kWh
- - - - -
07 3.2123: Convert to high volume low pressure (hvlp) paint guns $33,670 $2,400 - - - $20,900
-
gal
$12,770
-
lb
-
08 2.3212: Optimize plant power factor $27,950 - - $27,950
-
kW-mo/yr
- - - -
09 2.7145: Install skylights $15,400 $14,200 $15,400
202,000
kWh
- - - - -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,400 $2,000 $11,740
154,500
kWh
$2,660
-
kW-mo/yr
- - - -
11 2.4239: Eliminate or reduce compressed air usage $4,120 $430 $3,440
45,300
kWh
$680
-
kW-mo/yr
- - - -
12 2.7124: Make a practice of turning off lights when not needed $3,540 $130 $3,080
40,530
kWh
$460
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $977,080 $302,760 $300,560
3,954,330
kWh
$42,850
-
kW-mo/yr
$615,500
-
MMBtu
$20,900
-
gal
$12,770
-
lb
$(-15,500.0)
TOTAL IMPLEMENTED $733,540 $235,730 $168,020
2,211,030
kWh
$14,220
-
kW-mo/yr
$551,300
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs