ITAC Assessment: MO0075
ITAC logo
ITAC Assessment: MO0075
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product ELECTRIC MOTORS
NAICS
n/a
SIC 3621: Motors and Generators
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area
n/a
Annual Production 40,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,572 854,338
kWh
LPG $10,529 1,458
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,165 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $643

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $328 $6,500 $328
4,689
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $948 $370 $948
13,482
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $643 $150 $643
9,379
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $312 $670 $312
4,396
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $677 $5,000 $677
9,672
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $764 $332 $868
12,603
kWh
$(-104.0)
07 3.4115: Recover and reuse cooling water $1,493 - $54
879
kWh
$1,439
TOTAL RECOMMENDED $5,165 $13,022 $3,830
55,100
kWh
$1,335
TOTAL IMPLEMENTED $643 $150 $643
9,379
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs