Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product SAUSAGE AND BEEF PRODUCT
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area
n/a
Annual Production 7,500,000
lb
Production Hrs. Annual 2,340
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,153 1,101,993
kWh
Natural Gas $20,913 3,561
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,924 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,586

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 3.4115: Recover and reuse cooling water $4,522 $220 $29
293
kWh
- $4,493
02 2.7142: Utilize higher efficiency lamps and/or ballasts $272 $270 $308
4,396
kWh
- $(-36.0)
03 2.7142: Utilize higher efficiency lamps and/or ballasts $64 $970 $64
879
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $362 $50 $362
5,275
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $83 $37 $83
1,172
kWh
- -
06 2.4322: Use or replace with energy efficient substitutes $412 $1,075 - $412
-
MMBtu
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $209 - $209
2,931
kWh
- -
TOTAL RECOMMENDED $5,924 $2,622 $1,055
14,946
kWh
$412
-
MMBtu
$4,457
TOTAL IMPLEMENTED $4,586 $1,190 $93
1,172
kWh
- $4,493
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings