ITAC Assessment: MO0067
ITAC logo
ITAC Assessment: MO0067
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product HOT DOGS
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 76,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $635,706 11,597,011
kWh
Natural Gas $242,913 71,757
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $114,502 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,442

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 3.4115: Recover and reuse cooling water $85,751 - $323
5,862
kWh
- $85,428
02 2.4133: Use most efficient type of electric motors $3,986 $40,000 $3,986
72,685
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $9,352 $175 $9,352
170,574
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,382 $14,000 $4,382
80,012
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,589 - $1,709
31,067
kWh
- $(-120.0)
06 2.4221: Install compressor air intakes in coolest locations $8,788 $3,000 $8,788
160,317
kWh
- -
07 2.1233: Analyze flue gas for proper air/fuel ratio $654 $1,300 - $654
-
MMBtu
-
TOTAL RECOMMENDED $114,502 $58,475 $28,540
520,517
kWh
$654
-
MMBtu
$85,308
TOTAL IMPLEMENTED $9,442 $4,300 $8,788
160,317
kWh
$654
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs