| Assessment Year | 1992 |
|---|---|
| Principal Product | HOT DOGS |
| NAICS |
n/a
|
| SIC | 2013: Sausages and Other Prepared Meat Products |
| Sales Range | $10 M to 50M |
| # of Employees | 300 |
| Plant Area |
n/a
|
| Annual Production | 76,000,000
lb
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $635,706 | 11,597,011 |
kWh
|
$0.055 |
| Natural Gas | $242,913 | 71,757 |
MMBtu
|
$3.39 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $114,502 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,442 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 3.4115: Recover and reuse cooling water | $85,751 | - |
$323
5,862
kWh
|
- | $85,428 | |
| 02 | 2.4133: Use most efficient type of electric motors | $3,986 | $40,000 |
$3,986
72,685
kWh
|
- | - | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $9,352 | $175 |
$9,352
170,574
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,382 | $14,000 |
$4,382
80,012
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,589 | - |
$1,709
31,067
kWh
|
- | $(-120.0) | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $8,788 | $3,000 |
$8,788
160,317
kWh
|
- | - | |
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $654 | $1,300 | - |
$654
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $114,502 | $58,475 |
$28,540
520,517
kWh
|
$654
-
MMBtu
|
$85,308 | ||
| TOTAL IMPLEMENTED | $9,442 | $4,300 |
$8,788
160,317
kWh
|
$654
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs