Assessment Year | 1992 |
---|---|
Principal Product | SPORTING GOODS |
NAICS |
n/a
|
SIC | 3949: Sporting and Athletic Goods, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 225 |
Plant Area |
n/a
|
Annual Production | 590,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $158,483 | 2,451,348 |
kWh
|
$0.065 |
LPG | $17,747 | 3,409 |
MMBtu
|
$5.21 |
Fuel Oil #4 | $17,113 | 5,751 |
MMBtu
|
$2.98 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,073 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,105 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #4 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,899 | $18,800 |
$1,899
29,308
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,249 | $1,100 |
$2,488
38,687
kWh
|
- | $(-239.0) | |
03 | 3.4115: Recover and reuse cooling water | $3,103 | $640 |
$127
2,052
kWh
|
- | $2,976 | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $224 | $250 |
$224
3,517
kWh
|
- | - | |
05 | 2.4133: Use most efficient type of electric motors | $439 | $4,000 |
$439
6,741
kWh
|
- | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $311 | $210 |
$311
4,689
kWh
|
- | - | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,207 | $1,200 | - |
$1,207
-
MMBtu
|
- | |
08 | 2.4221: Install compressor air intakes in coolest locations | $1,433 | $973 |
$1,433
22,274
kWh
|
- | - | |
09 | 2.2511: Insulate bare equipment | $208 | $69 |
$208
3,224
kWh
|
- | - | |
TOTAL RECOMMENDED | $11,073 | $27,242 |
$7,129
110,492
kWh
|
$1,207
-
MMBtu
|
$2,737 | ||
TOTAL IMPLEMENTED | $6,105 | $25,310 |
$5,137
79,425
kWh
|
$1,207
-
MMBtu
|
$(-239.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #4 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs