Assessment Year | 1992 |
---|---|
Principal Product | BRAKE LEVER ASSEMBLIES |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 228 |
Plant Area |
n/a
|
Annual Production | 208,000
pieces
|
Production Hrs. Annual | 6,630
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $266,922 | 4,505,276 |
kWh
|
$0.059 |
Natural Gas | $71,648 | 16,626 |
MMBtu
|
$4.31 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $57,949 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,216 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $28,257 | - |
$34,055
315,358
kWh
|
$(-5,798.0)
-
MMBtu
|
- | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $13,485 | - |
$15,963
134,818
kWh
|
$(-2,478.0)
-
MMBtu
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $4,732 | $1,000 |
$4,732
80,012
kWh
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,778 | $150 |
$3,778
63,892
kWh
|
- | - | |
05 | 2.4312: Improve lubrication practices | $2,757 | - |
$2,757
46,600
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $897 | $850 |
$1,201
20,223
kWh
|
- | $(-304.0) | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,845 | $14,900 |
$2,845
48,066
kWh
|
- | - | |
08 | 2.4133: Use most efficient type of electric motors | $964 | $12,900 |
$964
16,413
kWh
|
- | - | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $133 | - |
$133
2,345
kWh
|
- | - | |
10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $101 | $253 |
$101
1,758
kWh
|
- | - | |
TOTAL RECOMMENDED | $57,949 | $30,053 |
$66,529
729,485
kWh
|
$(-8,276.0)
-
MMBtu
|
$(-304.0) | ||
TOTAL IMPLEMENTED | $13,216 | $29,800 |
$13,520
228,606
kWh
|
- | $(-304.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs