ITAC Assessment: MO0063
ITAC logo
ITAC Assessment: MO0063
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product BRAKE LEVER ASSEMBLIES
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 228
Plant Area
n/a
Annual Production 208,000
pieces
Production Hrs. Annual 6,630
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $266,922 4,505,276
kWh
Natural Gas $71,648 16,626
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,949 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,216

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $28,257 - $34,055
315,358
kWh
$(-5,798.0)
-
MMBtu
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $13,485 - $15,963
134,818
kWh
$(-2,478.0)
-
MMBtu
-
03 2.4221: Install compressor air intakes in coolest locations $4,732 $1,000 $4,732
80,012
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,778 $150 $3,778
63,892
kWh
- -
05 2.4312: Improve lubrication practices $2,757 - $2,757
46,600
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $897 $850 $1,201
20,223
kWh
- $(-304.0)
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,845 $14,900 $2,845
48,066
kWh
- -
08 2.4133: Use most efficient type of electric motors $964 $12,900 $964
16,413
kWh
- -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $133 - $133
2,345
kWh
- -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $101 $253 $101
1,758
kWh
- -
TOTAL RECOMMENDED $57,949 $30,053 $66,529
729,485
kWh
$(-8,276.0)
-
MMBtu
$(-304.0)
TOTAL IMPLEMENTED $13,216 $29,800 $13,520
228,606
kWh
- $(-304.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs