ITAC Assessment: WI0022
ITAC logo
ITAC Assessment: WI0022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product PRINTING
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 37,000,000
pieces
Production Hrs. Annual 4,750
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $310,428 3,453,986
kWh
Natural Gas $60,565 16,773
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,495 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,368

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4312: Improve lubrication practices $9,403 - $9,403
104,631
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,715 - $4,715
52,462
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $11,405 $196 $11,405
126,905
kWh
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $220 $500 - $320
-
MMBtu
$(-100.0)
05 2.7229: Air condition only space necessary $1,625 $2,500 - $1,625
-
MMBtu
-
06 2.3191: Use demand controller or load shedder $3,127 $5,000 $3,127
-
kWh
- -
TOTAL RECOMMENDED $30,495 $8,196 $28,650
283,998
kWh
$1,945
-
MMBtu
$(-100.0)
TOTAL IMPLEMENTED $27,368 $3,196 $25,523
283,998
kWh
$1,945
-
MMBtu
$(-100.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs