ITAC Assessment: LM0104
ITAC logo
ITAC Assessment: LM0104
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product hydraulic actuators
NAICS 332912: Fluid Power Valve and Hose Fitting Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area 117,000
ft2
Annual Production 30,000
pieces
Production Hrs. Annual 6,090
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $324,062 3,772,747
kWh
Electricity Demand $143,226 11,472
kW-mo/yr
Electricity Fees $(-13,331.0) -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,711 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,634

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4133: Use most efficient type of electric motors $1,080 $787 $839
9,766
kWh
$241
-
kW-mo/yr
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $388 $300 $301
3,504
kWh
$87
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $920 $250 $717
8,345
kWh
$203
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $12,554 $7,000 $5,490
63,945
kWh
$7,064
-
kW-mo/yr
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,769 - $2,158
25,010
kWh
$611
-
kW-mo/yr
TOTAL RECOMMENDED $17,711 $8,337 $9,505
110,570
kWh
$8,206
-
kW-mo/yr
TOTAL IMPLEMENTED $13,634 $7,787 $6,329
73,711
kWh
$7,305
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs