ITAC Assessment: AS0421
ITAC logo
ITAC Assessment: AS0421
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Chrome-coated pieces
NAICS 336411: Aircraft Manufacturing
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $500
k
to 1
M
# of Employees 11
Plant Area 4,080
ft2
Annual Production 1,500
pieces
Production Hrs. Annual 2,420
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,545 403,680
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $83,360 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (haz) Savings One-time Revenue or Avoided Cost Savings
01 4.431: Train operators for maximum operating efficiency $79,716 $39,658 - - $79,716
02 3.6112: Use filter and drying oven to reduce sludge volume $3,068 $1,500 - $3,068
-
gal
-
03 2.3312: Install efficient rectifiers $576 $15,000 $576
9,000
kWh
- -
TOTAL RECOMMENDED $83,360 $56,158 $576
9,000
kWh
$3,068
-
gal
$79,716
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs