ITAC Assessment: MO0061
ITAC logo
ITAC Assessment: MO0061
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product SOFT CANDY, HARD CANDY
NAICS
n/a
SIC 2064: Candy and Other Confectionery Products
Sales Range $50
M
to 100
M
# of Employees 320
Plant Area
n/a
Annual Production 15,000
ton
Production Hrs. Annual 7,488
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $546,859 8,250,293
kWh
Natural Gas $55,412 11,625
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,389 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,986

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $2,377 $18,250 $2,377
35,756
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,981 $1,170 $4,981
75,029
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $11,628 $1,240 $11,628
175,557
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,403 $20 $2,403
36,342
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,455 $14,300 $1,455
21,981
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,545 $688 $1,694
25,498
kWh
$(-149.0)
TOTAL RECOMMENDED $24,389 $35,668 $24,538
370,163
kWh
$(-149.0)
TOTAL IMPLEMENTED $21,986 $35,648 $22,135
333,821
kWh
$(-149.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs